One of the greatest things about BOSS NOSS is the simplicity of
the installation and setup. BOSS NOSS developers have made it so any
rider, recreational or competitive, can have the extra power, fun and excitement
of a Nitrous Oxide kit. Installation normally takes around an hour,
depending on the snowmobile. You can either do the installation yourself,
or have one of our qualified
authorized dealers
do it for you.
CLICK HERE FOR
DETAILED INSTALLATION INSTRUCTIONS
BOSS NOSS INSTALLATION BASICS:
Tools You Will Need: Drill, Screwdriver, Wrench,
Scissors or Wire Cutters, Pliers
The Process: Here is a basic list of the simple
procedures involved with installing BOSS NOSS
- Mount Smart Box to a flat surface using the included
Velcro. This is the main hub where all the fuel and nitrous lines run.
- Mount Nitrous Bottle. Kit will work best if bottle
has a downward angle and the valve faces the rear of the sled. BOSS can
usually tell you the best place to mount your bottle.
- Tap BOSS Fuel Line into your Sled's Main Fuel Line.
This is done using a simple T-Connector
- Install BOSS NOSS Fuel Delivery System by inserting 2 fuel
dumps into Carburetor Boots. The fuel dumps are connected to one Micro
Fuel Manager that you will mount in an easily accessible area.
- Mount 2 Horsepower Boost Nozzles inside Air Box using
included bracketing. The Nozzles & Brackets will mount right in front of
your Carburetors. Once nozzles are mounted, attach them to Nitrous Line
(coming from the Smart Box)
- Mount On-Demand switch to desired location on handlebars.
ITS AS SIMPLE AND EASY AS THAT!
Database Results Wizard Error
The operation failed. If this continues, please contact your server administrator.